Hi everyone
I am currently refitting a kitchen which I have done in the past before. However the walls of this kitchen are dry lined over the top of thermalite block. What is the best way please to fix the wall units to the wall bearing in mind there is about 20mm of plaster/plasterboard/gap until you reach the thermalite?
Thanks in advance
M
I am currently refitting a kitchen which I have done in the past before. However the walls of this kitchen are dry lined over the top of thermalite block. What is the best way please to fix the wall units to the wall bearing in mind there is about 20mm of plaster/plasterboard/gap until you reach the thermalite?
Thanks in advance
M