Morning all,
I'm due to start tiling a small splashback in my kitchen using 100 x 200 metros.
My question is, the walls were freshly plastered and I added a mist coat about 8 months ago as i wasnt sure what I was going to do long term. What prep before tiling would be recommended on this basis? Does the mist coat need removing and should I prime with SBR?
Many thanks.