Thanks for advice over the last week for help installing my zenith compact laminate
I didn't find it hard to cut, just took longer to do. Everything went perfectly to plan, u til it came to joining thr worktops. It was a right faff with having a chimney breast in the way, so the end result it that they're level but there is a 2mm gap between the joins. The biscuits just would not go in and the glue dried fast!.
So, I'm left with a 2mm gap to fill. What's the best method of doing this/what...
Zenith installation help needed
I didn't find it hard to cut, just took longer to do. Everything went perfectly to plan, u til it came to joining thr worktops. It was a right faff with having a chimney breast in the way, so the end result it that they're level but there is a 2mm gap between the joins. The biscuits just would not go in and the glue dried fast!.
So, I'm left with a 2mm gap to fill. What's the best method of doing this/what...
Zenith installation help needed